Skip to content
ZIPMARK / PRODUCTION & QC

From components to a working system

Careful component matching, considered assembly and a checked result. Every stage starts with your requirements and leads to a clear outcome.

01Selected for your task
02Assembly and setup
03Result verification
BUILD / CHECK / HANDOVER

Five stages to your desk

Our process for a custom build. For a batch of workstations, the specification standard and acceptance process are agreed separately.

Equipment for your organization

Open a stage to see what happens along the way

Requirements and specification

We discuss software, workload, displays and budget. Components and acceptable alternatives are agreed before assembly.

Agreed configuration

Compatibility review

Socket and memory, graphics card clearance, power, cooling and connections are checked, with future upgrades in mind.

Build plan

Assembly and setup

We install components, route cables and check connections. System setup follows the agreed scope of your order.

Assembled system

Load testing

Startup, memory, storage and cooling are checked. The test scope is selected for the configuration and its intended workload.

Verified result

Handover and next steps

We confirm the final configuration and explain connections and care. Warranty and service terms are specified for your particular order.

Ready for use
Computer in the ZIPMARK engineering style
DETAILS MATTER

Considered on the inside

A computer is more than its CPU and graphics card. Airflow, accessible connections, cable routing and power headroom all affect daily use and future servicing.

Plan your build
YOUR BUILD BRIEF

What to tell your engineer

Your software

Games, work applications, display resolution and project types. For editing, include source formats; for 3D, describe scenes and rendering.

Your workspace

Space for the case, noise preferences and existing displays and peripherals. Tell us which components you want to keep.

Plans and priorities

Budget, preferred timing and future upgrades. If quiet operation, a compact footprint or performance comes first, start there.